Status check on the new Perham High School… now that school is out, the countdown is on! Here are some photos taken this morning.
Classroom painting is complete and wall furnishings are being hung!
Classroom painting is complete and wall furnishings are being hung!
Cabinetry is being delivered and installed.
Career Tech Building with mezzanine for storage above.
The large curtain wall window has been installed for the Great Hall! This will soon feature a large yellowjacket logo to proudly display Perham pride.
Natural light is a large part of the new school design with numerous windows throughout.
Windows have been installed at the main floor Administration wing.
The Career Tech building is the steel structure beyond, with the ALC space in the foreground. The orange will soon be replaced with windows on both sides of the connecting link between the main school and Career Tech building.
Leave a Comment